• 2001-2013 - Facilities of JSC "AGMK". Revision, repair, and adjustment of the PMG. Overhaul of large machines 1.1 MW - 12 MW. Vibration adjustment and repair of 12 MW SC rotors, repair of waste-heat boilers, installation of steam pipelines at the high-voltage power plant of the Almalyk CHP. Overhaul of the electric motor and adjustment of the SK 12 MW rotor.

#

• 2009-2013 - Objects of JSC "Ammofos-Maxam". Overhaul of large machines 1.2 - 1.3 MW

#

• 2011 - Objects of Uzbekenergo JSC. Overhaul and adjustment of the substation "Uzbekistan" transformer TDTN 110/35/6 OJSC "Бухараэлектросеть"

#

• 2011-2013 - overhaul and adjustment of the Kulol 110/35/6 substation at the "KapSanTeks" Unitary Enterprise
• Installation and commissioning of the substation 2 * 1600 6 / 0.4 kW
• Installation and commissioning of the substation 2 * 1000 6 / 0.4 kW

#

• 2014-2016 - installation and adjustment of the accounting system and replacement of electric meters of OJSC "TashPES"

#

• 2015-2017 - conducting an energy survey of facilities of the Uzbekenergo State Joint Stock Company

• Objects of JSC "Namangan PTES", "Uychi RESP", "Pop RESP"

• JSC "Karkalpak PTES", "Amudaryo RESP", "Turtkul RESP"

• JSC "Sirdaryo PTES", "Gulistan RESP"

• JSC "Surkhondaryo PTES", "Angor RESP", "Muzrabod RESP"

• JSC "Fergana PTES", "Toshlok RESP"

• JSC "Bukhara RMZ"

• 2017 to date - production of electrical products, traverses and insulators